Trailer build part II: interior work

After the framing and insulation panels were installed, we started work on the door.

This was a humbling experience given that it needs to be really, really exact. Thankfully, William's friend Tom was in town, so we conscripted him into work.


We finished up the windows with flashing and insulation.

We then started running the pipes for the water pump.

We brought in the fiberglass shower stall and the 125 gallon water tank.

Next came plumbing for the sink.

Next was the inflow to the water tank and the electrical work for the pump.

William installed the propane heater.


Overall, we were moving right along.

We decided to tackle the flooring next.





Next we installed the half wall for the shower.


And installed some of the plumbing.


Not pictured is all the work William did on the electrical system (the tedious nature doesn't make for enthralling videos). Nevertheless, here is a picture of the 'control panel' on the back wall, including the tankless water heater next to the shower.

At this point, we turned to the exterior (cue part III).